Photo: Cool3d (CC BY-SA 3.0)
rozestavěná lanová dráha Tži kříže
About this place
An unfinished funicular or rack railway that was to run from Vřídelní street up the Tři kříže hill; building began in the winter of 1913.
It was designed by the Swiss firm of the engineer H. H. Peter and built by the Austrian firm Rella und Neffe. The First World War halted work in the summer of 1914. After the war the track bed and the Panorama halfway station were completed, but the line was never finished, nor was its type ever decided. An overgrown concrete cutting with small bridges survives, as does the Panorama station, burnt out in 1998. In 2011 the town shelved plans to complete it.
Details
So far we only know where this place is.
Is this your business? Claim it for free and keep the details, opening hours, photos and offers up to date yourself.
Know more? Add details or report a mistake
Facts from OpenStreetMap (18 November 2026), not yet verified by the owner or by Mestanova. Open in OpenStreetMap · ODbL-1.0
Where it is
Karlovy Vary-centrum, Karlovy Vary